5 .1 .7 Electrical connections on
the hydraulic module side
Access to the connector terminals
-
Remove the front panel.
-
Open the electrical cabinet.
-
Make the connections according to the diagram
).
figure 43 -
Description of the hydraulic module's electrical cabinet
X10
X12
X13
X14
X15
X30
X50
X70
X75
X80
X82
X83
X84
Gas regulation board (LMS)
Manages the operation of the gas exchanger
(exchanger ignition, safety, regulation).
HP regulation board (RVS)
manages the whole appliance and
regulates the different heating circuits.
2 COM interfaces (OCI 345)
provide the communication between the
2 LMS and RVS boards and the transmission
of the climate data (slope, temperatures).
Interface board
provides the link with
the outdoor unit.
Connection terminal
Grommets (power)
Grommet (sensors)
Do not fit the sensor wires and the power supply wires
in parallel in order to avoid interferences due to the
voltage surges in the power supply.
Ensure that all of the electrical cables are housed in the
spaces provided.
Installation and commissioning instructions "1485 - EN"
Heat pump alféa hybrid duo gas
- 42 -
Summary of Contents for WOYG112LHT
Page 51: ... Installation and commissioning instructions 1485 EN 51 Heat pump alféa hybrid duo gas ...
Page 69: ... Installation and commissioning instructions 1485 EN 69 Heat pump alféa hybrid duo gas ...
Page 90: ...Installation and commissioning instructions 1485 EN Heat pump alféa hybrid duo gas 90 ...