Section 2: installation
Spare and Location Requirements
Power Requirements and Secifications
Grounding Requirements
Wire Length Limitations
System Ground Connection
AC Outlet Tests
CO Line Protector
Surge Protectors
IROB Protectors
Static Discharge Problems
Typical MERLIN II System Wiring
Preparing the Network Interface
Testing the Outside Lines
Connecting Outside Lines to the Control Unit
Tie Line Module Wiring
Voice Terminal Wiring
Connecting Voice Terminal Wiring to the Control Unit
Wiring a Voice Terminal for Two Voice-Pairs
Summary of Contents for administration and
Page 40: ...FIGURE 1 9 System architecture Theory of Operation 1 37 ...
Page 175: ...Top cover Front cover FIGURE 2 27 Control unit covers Testing the System 2 107 ...
Page 211: ...FIGURE 3 I A MERLIN II System Display Console The Administrator Attendant Console 3 3 ...
Page 213: ... FIGURE 3 2 A BIS 34D Console The Administrator Attendant Console 3 5 ...
Page 331: ...General Tests 4 55 Reaming the Control Unit 4 55 Testing Outside Lines 4 56 ...