Print out the tie line translation and make sure that the
ports are configured as described in step 4.
> If the tie lines are translated correctly, go
on to
step 7.
> If the tie lines are not translated correctly
according to Form lb, repeat steps 4 through 6. If
the tie lines still aren’translated correctly, call the
National Service Assistance Center (NSAC)
at
l-800-628-2888 for help.
Remove the bridging clips and connect the tie line
ports to the network interface (a 66-type connecting
block).
From the 66-type block, cross-connect he line port 1 to
one of the ports you want to test (ports 2,3, or 4). See
Figure 4-3.
.
NOTE: Test only one port at a time.
4-24 Tie Line Troubleshooting
Summary of Contents for administration and
Page 40: ...FIGURE 1 9 System architecture Theory of Operation 1 37 ...
Page 175: ...Top cover Front cover FIGURE 2 27 Control unit covers Testing the System 2 107 ...
Page 211: ...FIGURE 3 I A MERLIN II System Display Console The Administrator Attendant Console 3 3 ...
Page 213: ... FIGURE 3 2 A BIS 34D Console The Administrator Attendant Console 3 5 ...
Page 331: ...General Tests 4 55 Reaming the Control Unit 4 55 Testing Outside Lines 4 56 ...