25 Readminister port 1 for Type 1 Compatible.
Testing Type 5
Simplex Tie lines
26 Print out the tie line translation and make sure that all
the ports are configured for Type 1 Compatible.
> If the tie lines are translated correctly according to
Form 1b, testing is complete.
> If the tie lines are not translated correctly, repeat
steps 4 through 6.
these steps:
1 Connect
an attendant console to station port 10.
2 Connect a printer to the SMDR port on the Processor
Module.
Set the printer port to 1200 baud.
To test tie lines configured for Type 5 Simplex, follow
3 Set the Tie Line Module switches to E&M
signaling/protected or unprotected mode. Refer to
“Administering Tie Lines” on page 3-50 for
instructions.
4 Administer tie line port 1, and any ports being tested
(ports 2,3, or 4), to Type 5 Simplex. Refer to
“Selecting the Signal Type” on page 3-56 for
instructions. Administer all signaling parameters as
specified by Form 1b, System Form- Tie Lines.
5 Assign the tie lines to two stations, called station A
and station B
in this procedure, in order to conduct the
tests. Assign
the tie lines to a line pool (890 through
899).
Tie Line Troubleshooting 4-23
Summary of Contents for administration and
Page 40: ...FIGURE 1 9 System architecture Theory of Operation 1 37 ...
Page 175: ...Top cover Front cover FIGURE 2 27 Control unit covers Testing the System 2 107 ...
Page 211: ...FIGURE 3 I A MERLIN II System Display Console The Administrator Attendant Console 3 3 ...
Page 213: ... FIGURE 3 2 A BIS 34D Console The Administrator Attendant Console 3 5 ...
Page 331: ...General Tests 4 55 Reaming the Control Unit 4 55 Testing Outside Lines 4 56 ...