4
Operation
22
STERRAD VELOCITY Reader User’s Guide
Figure 14.
Activate the BI
Place the BI in the selected well immediately after activation. An audible beep
and a brief teal circle on the well indicator number will confirm placement in the
well. The reader will detect that the BI has been placed in the well and will begin the
countdown until the result is displayed.
Figure 15.
Place BI in Well
In-Progress Summary
Touch any active well number during a test to open the In-Progress Summary and
get detailed information about the test in-progress.
Summary of Contents for Sterrad Velocity Reader
Page 1: ...User s Guide AB11321031 AB11321031 50 January 2021 ASP 2021 All rights reserved Reader...
Page 6: ...vi STERRAD VELOCITY Reader User s Guide THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ...8 STERRAD VELOCITY Reader User s Guide THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...30 STERRAD VELOCITY Reader User s Guide THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...34 STERRAD VELOCITY Reader User s Guide THIS PAGE INTENTIONALLY LEFT BLANK...
Page 52: ...46 STERRAD VELOCITY Reader User s Guide THIS PAGE INTENTIONALLY LEFT BLANK...
Page 66: ...THIS PAGE INTENTIONALLY LEFT BLANK 60 STERRAD VELOCITY Reader User s Guide...
Page 68: ...THIS PAGE INTENTIONALLY LEFT BLANK 62 STERRAD VELOCITY Reader User s Guide...
Page 70: ...THIS PAGE INTENTIONALLY LEFT BLANK 64 STERRAD VELOCITY Reader User s Guide...
Page 72: ...THIS PAGE INTENTIONALLY LEFT BLANK 66 STERRAD VELOCITY Reader User s Guide...