4
Operation
18
STERRAD VELOCITY Reader User’s Guide
Follow the on-screen instructions to activate the BI (see illustrations below).
If using a STERRAD VELOCITY BI Activator (43250), follow the activation instructions
supplied with the Activator.
Touch
Activated
once complete.
Figure 8.
Activate the BI
Place the BI in the selected well immediately after activation. An audible beep and
a brief teal circle on the well indicator number will confirm placement in the well. The
reader will detect that the BI has been placed in the well and will begin the countdown
until the result is displayed. The dot above the well number indicates it is a positive
control BI.
Figure 9.
Place BI in Well
Summary of Contents for Sterrad Velocity Reader
Page 1: ...User s Guide AB11321031 AB11321031 50 January 2021 ASP 2021 All rights reserved Reader...
Page 6: ...vi STERRAD VELOCITY Reader User s Guide THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ...8 STERRAD VELOCITY Reader User s Guide THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...30 STERRAD VELOCITY Reader User s Guide THIS PAGE INTENTIONALLY LEFT BLANK...
Page 40: ...34 STERRAD VELOCITY Reader User s Guide THIS PAGE INTENTIONALLY LEFT BLANK...
Page 52: ...46 STERRAD VELOCITY Reader User s Guide THIS PAGE INTENTIONALLY LEFT BLANK...
Page 66: ...THIS PAGE INTENTIONALLY LEFT BLANK 60 STERRAD VELOCITY Reader User s Guide...
Page 68: ...THIS PAGE INTENTIONALLY LEFT BLANK 62 STERRAD VELOCITY Reader User s Guide...
Page 70: ...THIS PAGE INTENTIONALLY LEFT BLANK 64 STERRAD VELOCITY Reader User s Guide...
Page 72: ...THIS PAGE INTENTIONALLY LEFT BLANK 66 STERRAD VELOCITY Reader User s Guide...