16
SETTING
8
FOREWORD
Images and the relevant description texts contained in this manual are given as a reference as they can vary depending on the
VT
used. If the descriptions do not correspond to the text displayed in your
VT
, refer to the manual attached to the latter.
8.1
“OBJECT POOL” loading
Press to display the OP selection
page.
D
: ECU OP.
Press to enter the main screen.
Wait for the ECU OP to be fully
loaded.
8.2
"OBJECT POOL of the second Sprayer machine" loading
The OP, labelled with number
2
, for the second control unit IBX100 Sprayer is going to be installed.
This icon will allow to manage the OP and thus the second Sprayer control unit, independently from the first one.
This new function meets the need to install two IBX of the same type on the same machine.
To connect the second IBX100 Sprayer2 to the system, it is advisable to contact Arag Technical Assistance.
Summary of Contents for 4679004
Page 75: ...Notes 75...