OP
ERA
TION
4.9
SYSBOT6
BOT 15 SEC PAUS
NO
[YES]
To avoid residual effluent drops falling into a subsequent
Bottle the Sampler can be programmed to hold the
Distributor Pipe over each Bottle for 15 seconds following
Sample Release
➔
See SYSBOT7
SYSBOT7
INCREMENT BY
TIME
[SAMPLES]
The Bottler can be programmed to advance bottles (or
groups) either at regular time intervals or after a fixed
number of samples
➔
See SYSBOT8 if TIME and SAMPLING MODE is
FLOW
Otherwise:
➔
See SYSBOT9
SYSBOT8
MAX SAMPS/BOTTLE
0005
Set maximum number of allowable samples per Bottle
➔
See SYSBOT9
SYSBOT9
BOTTLE CLEANING
NO
[YES]
Select this where a 2 x 4.5 litre Self-Emptying Self-
Cleaning Bottler has been supplied with your S300
Sampler
➔
See SETPROG
Program Settings
IDENT
DISPLAY
ACTION / COMMENTS
PROGSAM1
SAMPLER SETTINGS
> > > > > > >
Information screen only
➔
See PROGSAM2
PROGSAM2
START ROUTINE
IMMEDIATELY
[21-05-12 15:30]
Set a date / time for the sample routine to commence, or
select IMMEDIATELY. If IMMEDIATELY is selected the
sample routine will start at the time the RUN PROGRAM
button is pressed
➔
See PROGSAM3
PROGSAM3
STOP ROUTINE
NON STOP
[22-05-00 15:30]
Set a date / time for the sample routine to stop, or select
NON STOP
➔
See PROGSAM4 if time between START
ROUTINE and STOP ROUTINE is less than 24
hours and both are within the same day
➔
See PROGSAM5 if SAMPLING MODE is TIME
➔
See PROGSAM6 if SAMPLING MODE is FLOW &
IMPULSE
➔
See PROGSAM7 if SAMPLING MODE is FLOW &
4/20MA
PROGSAM4
REPEAT DAILY
NO
[YES]
If the duration of the sampling routine is less than 24 hours
it can be repeated daily if required
➔
See PROGSAM5 if SAMPLING MODE is TIME
➔
See PROGSAM6 if SAMPLING MODE is FLOW &
IMPULSE
➔
See PROGSAM7 if SAMPLING MODE is FLOW &
4/20MA
Summary of Contents for Aquacell P2 Series
Page 1: ...AQUACELL PORTABLE WASTEWATER SAMPLERS USER GUIDE Sira MC 050059 Issue 20 2...
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ...CONTENTS OF PACKAGE 1 2...
Page 14: ...CONTENTS OF PACKAGE 1 8...
Page 16: ...INTRODUCTION 2 2...
Page 26: ...INSTALLATION 3 2...
Page 36: ...INSTALLATION 3 12...
Page 38: ...OPERATION 4 2...
Page 56: ...OPERATION 4 20...
Page 58: ...MAINTENANCE 5 2...
Page 70: ...TECHNICAL SPECIFICATION 6 2...
Page 77: ......