INS
TAL
LAT
ION
3.1
INSTALLATION
Assembling & Connecting .................................................................. 3.3
Aquacell Sampler
Pressurised Pipeline Interface
Optional Connections
Temperature Probe
Aux 1
Mains
Ancillary Signals
Bottler
Security
Deploying the Sampler ....................................................................... 3.7
Positioning
Routing the Intake Hose
Setting the Sample Shot Volume
Conditioning the Cooling Elements (Aquacell P2-COOLBOX)
Power
Integral Battery
Mains Connection
Mains Connection with Integral Float Charged Battery
Separate 12VDC Battery Connection
Charging the Sampler Battery
3
Summary of Contents for Aquacell P2 Series
Page 1: ...AQUACELL PORTABLE WASTEWATER SAMPLERS USER GUIDE Sira MC 050059 Issue 20 2...
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ...CONTENTS OF PACKAGE 1 2...
Page 14: ...CONTENTS OF PACKAGE 1 8...
Page 16: ...INTRODUCTION 2 2...
Page 26: ...INSTALLATION 3 2...
Page 36: ...INSTALLATION 3 12...
Page 38: ...OPERATION 4 2...
Page 56: ...OPERATION 4 20...
Page 58: ...MAINTENANCE 5 2...
Page 70: ...TECHNICAL SPECIFICATION 6 2...
Page 77: ......