TABLE A11 - ROUTING THE CABLES IN THE
INSTRUMENT PANEL SUPPORT AREA
•
Connect the instrument panel connec-
tor and check that a click is heard, con-
firming the correct connection.
•
After the CLICK is heard, gently pull the
instrument panel in the direction of the
arrow, so as to tension the cables. If
the connection is connection is correct,
the connector will stay in its place.
TABLE B - FRONT ABS SPEED SENSOR PRE-
FITTING
(OHLINS)
•
After having placed the front ABS
speed sensor on the fork leg, secure
the wiring harness using a cable gland
(1) and a clamp (2).
Electrical system
Tuono V4 1100 Factory
ELE SYS - 114
Summary of Contents for 2Q000504
Page 1: ...SERVICE STATION MANUAL 2Q000504 Tuono V4 1100 Factory ...
Page 4: ......
Page 6: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 12: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 55: ...INDEX OF TOPICS SPECIAL TOOLS S TOOLS ...
Page 63: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 103: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 270: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 299: ...INDEX OF TOPICS ENGINE ENG ...
Page 415: ...INDEX OF TOPICS POWER SUPPLY P SUPP ...
Page 425: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 463: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 508: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 548: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 561: ...INDEX OF TOPICS BODYWORK BODYW ...