•
Insert the front bank manifolds with
new gaskets and connect them to the
central manifold.
•
Insert the locking nuts and screw them
partially to facilitate the subsequent op-
erations for the assembly of the ex-
haust system.
•
Connect the front bank lambda probe
connector and engage it in its support.
•
Insert the radiators from the right side
and engage the water radiator in the
support on the left side.
CAUTION
BEFORE FITTING THE RADIATORS, MAKE SURE THEY
ARE COMPLETELY EMPTY.
•
Operating from both sides, insert and
tighten the two screws used to fasten
the radiator to the support.
Engine from vehicle
Tuono V4 1100 Factory
ENG VE - 292
Summary of Contents for 2Q000504
Page 1: ...SERVICE STATION MANUAL 2Q000504 Tuono V4 1100 Factory ...
Page 4: ......
Page 6: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 12: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 55: ...INDEX OF TOPICS SPECIAL TOOLS S TOOLS ...
Page 63: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 103: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 270: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 299: ...INDEX OF TOPICS ENGINE ENG ...
Page 415: ...INDEX OF TOPICS POWER SUPPLY P SUPP ...
Page 425: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 463: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 508: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 548: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 561: ...INDEX OF TOPICS BODYWORK BODYW ...