•
Refit the wiring harnesses on the radi-
ator support and secure them with a
new clamp.
•
Connect the coolant radiator pipe on
the right side and secure it using the
specific metal clamp.
•
Connect the oil pipe to the fitting and
secure it using a new metal clamp.
•
Connect the cooling system pipe to the
pump, the cross member that goes to
the thermostatic valve and secure both
of them using the metal clamps.
Tuono V4 1100 Factory
Engine from vehicle
ENG VE - 293
Summary of Contents for 2Q000504
Page 1: ...SERVICE STATION MANUAL 2Q000504 Tuono V4 1100 Factory ...
Page 4: ......
Page 6: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 12: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 55: ...INDEX OF TOPICS SPECIAL TOOLS S TOOLS ...
Page 63: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 103: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 270: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 299: ...INDEX OF TOPICS ENGINE ENG ...
Page 415: ...INDEX OF TOPICS POWER SUPPLY P SUPP ...
Page 425: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 463: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 508: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 548: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 561: ...INDEX OF TOPICS BODYWORK BODYW ...