TABLE A1 - LH INSTRUMENT PANEL SUP-
PORT PRE-FITTING
•
Place the cable gland as indicated.
TABLE A2 - ROUTING THE CABLES IN THE
RIGHT SIDE OF THE INSTRUMENT PANEL
SUPPORT AREA
•
Using a rubber cable gland, fasten the
right side light switch wiring harness (1)
with the wiring harness of the demand
sensor (2).
•
The wiring harness of the light switch
must pass between the right side in-
strument panel support and the chas-
sis, as indicated.
BOTH WIRING HARNESSES MUST PASS
ABOVE THE FRICTION CABLE
Tuono V4 1100 Factory
Electrical system
ELE SYS - 109
Summary of Contents for 2Q000504
Page 1: ...SERVICE STATION MANUAL 2Q000504 Tuono V4 1100 Factory ...
Page 4: ......
Page 6: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 12: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 55: ...INDEX OF TOPICS SPECIAL TOOLS S TOOLS ...
Page 63: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 103: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 270: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 299: ...INDEX OF TOPICS ENGINE ENG ...
Page 415: ...INDEX OF TOPICS POWER SUPPLY P SUPP ...
Page 425: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 463: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 508: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 548: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 561: ...INDEX OF TOPICS BODYWORK BODYW ...