TABLE Q - FRONT LAMBDA
•
After having correctly connected the
rear lambda probe connector with its
counterpart, secure it using the special
support to the side fairing metal sup-
port.
•
Insert the wiring harness in the tow in-
dicated cable glands.
TABLE Q1 - FRONT LAMBDA
•
The wiring harness must pass behind
the cooling system pipe.
TABLE R - CONNECTIONS ON THE TANK
•
After having inserted the fuel level
probe, place the wiring harness as in-
dicated, passing it under the cover, as
indicated
Electrical system
Tuono V4 1100 Factory
ELE SYS - 138
Summary of Contents for 2Q000504
Page 1: ...SERVICE STATION MANUAL 2Q000504 Tuono V4 1100 Factory ...
Page 4: ......
Page 6: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 12: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 55: ...INDEX OF TOPICS SPECIAL TOOLS S TOOLS ...
Page 63: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 103: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 270: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 299: ...INDEX OF TOPICS ENGINE ENG ...
Page 415: ...INDEX OF TOPICS POWER SUPPLY P SUPP ...
Page 425: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 463: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 508: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 548: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 561: ...INDEX OF TOPICS BODYWORK BODYW ...