TABLE K - VOLTAGE REGULATOR
•
Insert the pick up connector in the spe-
cific tab on the internal fairing and after
having connected the voltage regulator
connectors, secure the voltage regula-
tor and pick-up wiring harnesses using
two clamps.
•
Leave the circled area free.
TABLE K1 - VOLTAGE REGULATOR
•
Connect the left electric fan connector
and lock it with a clamp, as indicated.
•
Pass the wiring harnesses of the volt-
age regulator and of the pick-up inside
the pre-installed cable gland on the
canister.
•
Fasten the electric fan connector to the
canister support.
Electrical system
Tuono V4 1100 Factory
ELE SYS - 130
Summary of Contents for 2Q000504
Page 1: ...SERVICE STATION MANUAL 2Q000504 Tuono V4 1100 Factory ...
Page 4: ......
Page 6: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 12: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 55: ...INDEX OF TOPICS SPECIAL TOOLS S TOOLS ...
Page 63: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 103: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 270: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 299: ...INDEX OF TOPICS ENGINE ENG ...
Page 415: ...INDEX OF TOPICS POWER SUPPLY P SUPP ...
Page 425: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 463: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 508: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 548: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 561: ...INDEX OF TOPICS BODYWORK BODYW ...