Installation
|
3-1
INSTALLATION
The operations in this chapter should only be performed by qualified
service personnel experienced with electrical safety techniques. There
are no operator serviceable components inside the CEM/Humox sys-
tem. Never service the sensor unless power has been removed and it
has been allowed to cool for at least one hour. Also, always use gloves
when working on the sensor.
This chapter shows you how to install your sensor components, and includes the
following sections:
•
Inspect Shipping Contents
•
Mechanical Installation
•
Wiring
•
Series 2000 Control Unit
•
Option Card Installation
Inspect Shipping Contents
Remove any packing material from the sensor and check for damage. If any is
found, notify the shipper.
Mechanical Installation
This section describes how to perform the mechanical installation portion of your
system installation. This includes the following:
•
Mounting the Wet and Dry CEM/O
2
Sensor
•
Sample Gas Requirements/Connections
•
Calibration Setup
Summary of Contents for CEM/Humox
Page 20: ...2 4 Thermox CEM Humox Analyzer This page intentionally left blank ...
Page 38: ...3 18 Thermox CEM Humox Analyzer Figure 3 16 Series 2000 alarm connections example ...
Page 44: ...3 24 Thermox CEM Humox Analyzer ...
Page 76: ...4 32 Thermox CEM Humox Analyzer This page intentionally left blank ...
Page 105: ...Service and Parts 7 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 107: ...Service and Parts 7 5 Figure 7 1 Cell replacement ...
Page 130: ...B 4 Thermox CEM Humox Analyzer This page intentionally left blank ...
Page 134: ...C 4 Thermox CEM Humox Analyzer Figure C 1 Modulation of external power supply OPTIONAL ...
Page 136: ...D 2 Thermox CEM Humox Analyzer This page intentionally left blank ...