![Amazone EDX 9000-TC Operating Manual Download Page 226](http://html1.mh-extra.com/html/amazone/edx-9000-tc/edx-9000-tc_operating-manual_2919753226.webp)
Cleaning, maintenance and repairs
226
EDX 9000-TC BAH0048-6 09.2019
12.5.15 Pretensioning the hole-covering rollers
Fig. 330/…
(1) Tension spring
(2) Actuation lever for the hole covering rollers
(3) Relief pin in working position (hole covering
rollers are pre-tensioned)
Fig. 330
Pretension the hole-covering rollers
before beginning work.
1. Place the hole-covering rollers (Fig. 331/1)
on the singling drum.
Fig. 331
2. Dismount the singling drum (see section
"Removing/installing the singling drum",
Seite 207).
3. Turn in the relief pins (Fig. 332/1) by
approx. half a turn
Fig. 332
4. The actuation lever must completely lock in
place in the groove (Fig. 333/1).
5. Pretension both sides of the singling drum.
The hole-covering rollers rest on the
singling drum.
Fig. 333
Summary of Contents for EDX 9000-TC
Page 27: ...General Safety Instructions EDX 9000 TC BAH0048 6 09 2019 27 Fig 3 Fig 4...
Page 243: ...Hydraulic diagram EDX 9000 TC BAH0048 6 09 2019 243 Fig 346...
Page 244: ...Hydraulic diagram 244 EDX 9000 TC BAH0048 6 09 2019...
Page 245: ...Notes EDX 9000 TC BAH0048 6 09 2019 245 14 Notes Space for your notes...