Cleaning, maintenance and repairs
EDX 9000-TC BAH0048-6 09.2019
213
12.5
Maintenance schedule – overview
Carry out maintenance work when the first interval is reached.
The times, continuous services or maintenance intervals specified in
any third party documentation shall have priority.
Initial operation
Before initial
commissioning
Specialist
workshop
Check and service the hydraulic
hose lines.
This inspection has to be
recorded by the operator.
Section
12.5.16
Checking the oil level in the Vario
gearbox
Section 12.5.8
Checking inflation pressure of the
tyres
Section
12.5.12
After the first
10 operating hours
Specialist
workshop
Check and service the hydraulic
hose lines.
This inspection has to be
recorded by the operator.
Section
12.5.16
Specialist
workshop
Roller chain maintenance
Section
12.5.22
Specialist
workshop
Check all bolted connections for a
secure fit.
Section 12.10
Specialist
workshop
Checking the tightening torque of
the wheel nuts
Section
12.5.13
Summary of Contents for EDX 9000-TC
Page 27: ...General Safety Instructions EDX 9000 TC BAH0048 6 09 2019 27 Fig 3 Fig 4...
Page 243: ...Hydraulic diagram EDX 9000 TC BAH0048 6 09 2019 243 Fig 346...
Page 244: ...Hydraulic diagram 244 EDX 9000 TC BAH0048 6 09 2019...
Page 245: ...Notes EDX 9000 TC BAH0048 6 09 2019 245 14 Notes Space for your notes...