![Amazone ED 302 Operating Manual Download Page 166](http://html1.mh-extra.com/html/amazone/ed-302/ed-302_operating-manual_2919751166.webp)
Use of the implement
166
ED 02 BAH0023.0 03.14
10.3.1
Folding the implement booms and track markers (ED 452-K and ED 602-K)
Two safety clips (Fig. 195) are the mechanical
lock for the folded in implement booms.
Implement booms
•
Unlock before folding out (Fig. 195/B).
•
Lock after folding in (Fig. 195/A).
Fig. 195
Fold out the implement booms:
1. Unlock the implement booms.
2. Lift up the precision airplanter.
3. Operate the tractor control devices 2 and 3 (see section
"Hydraulic connections", Seite 82) until the implement booms are
folded out.
The traction of the sowing unit follows automatically.
The track markers of the ED 602-K fold out together with the
implement booms.
4. Set the tractor control devices 2 and 3 to the "0" position.
Folding in the implement booms:
Only ED 452-K:
1. Secure both track markers (see section "Track marker transport
lock", Seite 165).
Only ED 602-K:
1. Raise up both track markers (see section " Track marker
operation", Seite 167).
All types:
2. Lift up the precision airplanter.
3. Operate the tractor control devices 2 and 3 until the implement
booms are folded in.
The track markers of the ED 602-K fold in together with the
implement booms.
4. Lock the folded in implement booms.