Installation and hardware GigE
19
Goldeye G/CL Technical Manual V4.1.1
Overview of installation
This is an overview of the installation process: follow the hyperlinks to read the
step-by-step instructions.
•
Install Gigabit Ethernet network card and configure network card (Jumbo
Frames, Receive Descriptors, Performance Options, and IP address settings):
Configuring the host computer on page 21
.
•
Install the Allied Vision Vimba SDK plus corresponding Viewer:
See Installing camera software.
•
Connect camera to PC or laptop and ensure that the camera is powered:
Connecting your camera on page 25
.
•
Acquiring your first image with the Allied Vision Vimba Viewer:
See Using Allied Vision viewer applications.