x510 Series Installation Guide for Virtual Chassis Stacks
19
Management
Software and
Interfaces
Here are the management software and interfaces:
AlliedWare Plus Management Software
Command line interface
Web browser interface
Management
Methods
Here are the methods for managing the switches:
Local management through the Console port
Remote Telnet and Secure Shell management
Remote HTTP and HTTPS web browser management
SNMPv1, v2c, and v3
Power Supplies
The AT-x510-28GTX, AT-x510-28GPX, AT-x510-28GSX, AT-x510-
52GTX, and AT-x510-52GPX Switches have two pre-installed AC power
supplies. The AT-x510L-28GP, AT-x510L-28GT, AT-x510L-52GP, and
AT-x510L-52GT Switches have one pre-installed AC power supply. The
AT-x510-28GSX-80 Switch has two pre-installed DC power supplies. The
DC power supply option is only available in the AT-x510-28GSX-80
Switch. The power supplies are not field-replaceable.
Summary of Contents for AT-x510-28GPX
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 48: ...Chapter 1 Overview 48 ...
Page 70: ...Chapter 3 Beginning the Installation 70 ...
Page 84: ...Chapter 4 Installing the Switches on a Table or in an Equipment Rack 84 ...
Page 128: ...Chapter 9 Troubleshooting 128 ...