Chapter 6: Cabling the Stacking Ports
96
Figure 53. Installing the AT-StackXS/1.0 Transceiver in Slot S2
8. Repeat this procedure to connect additional switches to the stack with
AT-StackXS/1.0 transceivers.
9. To create the redundant path with the ring topology shown in Figure 19
on page 56 and Figure 20 on page 57, connect a stacking cable to the
empty stacking slots on the top and bottom switches.
10. After connecting the stacking cables to all the switches, go to Chapter
7, “Powering On the Stack” on page 101.