Chapter 7: Powering On the Stack
110
Monitoring the Initialization Processes
You may monitor the initialization sequence of the stack by connecting a
terminal or computer that has a terminal emulator program to the Console
port on any switch in the stack. You will see the messages in Figure 64
here to Figure 66 on page 112.
Figure 64. Switch Initialization Messages
Bootloader 2.0.11 loaded
Press <Ctrl+B> for the Boot Menu
Reading filesystem...
Loading flash:x510-5.4.2a-20120727-1.rel...
Verifying release... OK
Booting...
Starting base/first...
[
OK
]
Mounting virtual filesystems... [
OK
]
______________
____
/\ \
/ /______\
/
\ \_
__/ /| ______ |
/
\ |
|
/
| ______ |
/
\ \
/ /
\ ____ /
/______/\____\ \/ /____________/
Allied Telesis Inc.
AlliedWare Plus (TM) v5.4.2A
Current release filename: x510-5.4.2a-20120727-1.rel
Original release filename: x510-5.4.2A-20120727-1.rel
Built: Fri Jul 27 04:11:42 NZST 2012 by: maker@maker04-build
Mounting static filesystems...
[
OK
]
Checking flash filesystem...
[
OK
]
Mounting flash filesystem...
[
OK
]
Checking NVS filesystem...
[
OK
]
Mounting NVS filesystem...
[
OK
]
Starting base/dbus...
[
OK
]
Starting base/syslog...
[
OK
]
Starting base/loopback...
[
OK
]
Starting base/poe_done...
[
OK
]
Starting base/sysctl...
[
OK
]
Summary of Contents for AT-x510-28GPX
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 48: ...Chapter 1 Overview 48 ...
Page 70: ...Chapter 3 Beginning the Installation 70 ...
Page 84: ...Chapter 4 Installing the Switches on a Table or in an Equipment Rack 84 ...
Page 128: ...Chapter 9 Troubleshooting 128 ...