101
Chapter 7
Powering On the Stack
This chapter contains the following procedures:
“Powering On the Switches Individually” on page 102
“Powering On the Switches Simultaneously” on page 105
“Verifying the Stack” on page 107
“Monitoring the Initialization Processes” on page 110
Perform “Powering On the Switches Individually” on page 102 if you want
to control the assignment of the ID numbers to the switches of the stack.
The numbers are assigned in the order in which you power on the units.
Otherwise, perform “Powering On the Switches Simultaneously” on
page 105 to have the switches assign the numbers automatically. After the
ID numbers are assigned, you may change them with the STACK
RENUMBER command, described in the
Software Reference for x510
Series Switches, AlliedWare Plus Operating System
.
Caution
You should not change the ID numbers of the switches after you
begin to configure the parameter settings. Otherwise, the stack
might assign configuration settings to the wrong units.
Summary of Contents for AT-x510-28GPX
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 48: ...Chapter 1 Overview 48 ...
Page 70: ...Chapter 3 Beginning the Installation 70 ...
Page 84: ...Chapter 4 Installing the Switches on a Table or in an Equipment Rack 84 ...
Page 128: ...Chapter 9 Troubleshooting 128 ...