Chapter 6: Cabling the Stacking Ports
94
Figure 51. Installing the AT-StackXS/1.0 Transceiver in Slot S1
5. Remove the dust cover from the S2 slot in the next switch in the stack
as shown in Figure 52 on page 95.
Note
The cable must cross over to different slots on the switches. The
stack will not work if you connect two S1 or S2 slots together.
Release
tab
Summary of Contents for AT-x510-28GPX
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 48: ...Chapter 1 Overview 48 ...
Page 70: ...Chapter 3 Beginning the Installation 70 ...
Page 84: ...Chapter 4 Installing the Switches on a Table or in an Equipment Rack 84 ...
Page 128: ...Chapter 9 Troubleshooting 128 ...