x510 Series Installation Guide for Virtual Chassis Stacks
83
9. Tighten the two captive screws on the sides of the DC connector to
secure the connector to the switch. Refer to Figure 40.
Figure 40. Securing the DC Connector to the Switch
Caution
Verify that the DC circuit is powered off before connecting the power
wires from the switch to the circuit.
10. Connect the -48/-60VDC and RETURN wires to the DC circuit.
Warning
Circuit breaker is used as a disconnection device. To de-energize
the equipment, shut down the circuit breaker and then disconnect
the input wire.
E38
11. Repeat this procedure to connect the power wires to the second DC
power supply in the switch.
Note
Do not power on the switches at this time. Instead, go to Chapter 5,
“Verifying the Status of VCStack” on page 85.
Summary of Contents for AT-x510-28GPX
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 48: ...Chapter 1 Overview 48 ...
Page 70: ...Chapter 3 Beginning the Installation 70 ...
Page 84: ...Chapter 4 Installing the Switches on a Table or in an Equipment Rack 84 ...
Page 128: ...Chapter 9 Troubleshooting 128 ...