x510 Series Installation Guide for Stand-alone Switches
121
Figure 73. Installing an SFP or SFP+ Transceiver
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat Step 1 through Step 4
to install the remaining SFP or SFP+ transceivers in the line cards.
5. Remove the dust cover from the transceiver, as shown in Figure 74.
Figure 74. Removing the Dust Cover from an SFP or SFP+ Transceiver
6. Verify the position of the handle on the SFP transceiver. If the
transceiver is in a top slot, the handle should be in the upright position,
as shown in Figure 75 on page 122. If the transceiver is in a bottom
slot, the handle should be in the down position.
Summary of Contents for AT-x510-28GPX
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 48: ...Chapter 1 Overview 48 ...
Page 70: ...Chapter 3 Beginning the Installation 70 ...
Page 84: ...Chapter 4 Installing the Switches on a Table or in an Equipment Rack 84 ...
Page 128: ...Chapter 9 Troubleshooting 128 ...