6. Remove 6.5mm (0.25 in.) of insulation from one end of the red
-48/-60VDC wire. Refer to Figure 36 on page 81.
7. Insert the red -48/-60VDC wire into the left connector and secure it by
tightening the captive screw with a flat-head screwdriver. Allied Telesis
recommends tightening the screw to 5 in-lbs. Refer to Figure 38.
Figure 38. Inserting the -48/-60VDC Wire
8. Slide the DC connector into the slot on the switch. Refer to Figure 39.
Figure 39. Sliding the DC Connector into the Switch