
23
Scholar V Installation & Startup Manual 07/2016 New
Figure 8c. Typical Wiring Schematic - Page 3 of 3
B. 1. For Scholar V heat pump or air conditioner that interfaces with a building
automation system (BAS) or energy management system (EMS), detailed
instructions for the specific system being installed will be supplied separately by
the manufacturer of the BAS/EMS system.
The control of the GreenWheel
®
ERV or Ventilation relay (VR) and the
energy management relay (EMS) are 24 volt inputs to the PLC. If 120 V. of
240 inputs are required, additional relays must be installed in the factory or
in the field.
2. For models with an internal thermostat, no internal control wiring is required. The
thermostat is preprogrammed at the factory to maintain a heating mode
temperature of 64°F, and a cooling mode temperature of 82°F. To change these
settings refer to the directions in installation instructions for the thermostat.
3. For units with the reheat dehumidification option, the humidity sensor is integral
to the unit and communicates with the PLC.
C. Condensate drain line hook-up will be from the vertically downward 3/4” female PVC
slip fit port located just behind the breaker disconnect box in the lower right corner of
the Scholar V heat pump or air conditioner. Reference Figure 5 for the location of the