89
X. Operation
G. Changing Adjustable Parameters (continued)
Multiple boilers IWH Piped to Primary, Optional Domestic Hot Water Priority
Sequencer Master
(Boiler 1)
Boiler 2
Wiring locations:
Thermostat
X
DHW call for heat
X
System pump
X
DHW pump
X
Boiler Pump
X
X
Sequencer Master Parameter Selections:
Sequencer Master
Enabled
Indirect Water
Heater
“Primary Piped”
Pump Parameter Selections:
System Pump =
Central Heat,
Optional Priority
Never
Boiler Pump =
Any demand
Any
demand
DHW Pump =
Primary Loop
Piped IWH
Never
Explanation:
This piping arrangement permits the system pump to run or not run when there is a domestic hot water call for heat. Domestic
hot water priority is optional. It is permissible for the domestic and system pumps to run at the same time. The boiler pump
must run for every call for heat.
Example Pump Parameter selections (continued):
Multiple Boilers, IWH piped to primary, system pump required to run for any call for heat
Sequencer Master
(Boiler 1)
Boiler 2
Wiring locations:
Thermostat
X
DHW call for heat
X
System pump
X
DHW pump
X
Boiler Pump
X
X
Sequencer Master Parameter Selections:
Sequencer Master
Enabled
Indirect Water
Heater
“Primary Piped”
Pump Parameter Selections:
System Pump =
Any demand
Never
Boiler Pump =
Any demand
Any demand
DHW Pump =
Primary Loop
Piped IWH
Never
Explanation:
This piping arrangement requires the system pump to be running for any calls for heat. Also the boiler pump must run for any
call for heat.
Summary of Contents for APEX
Page 57: ...57 VIII Electrical continued Figure 26 Ladder Diagram ...
Page 58: ...58 VIII Electrical continued ...
Page 59: ...59 Figure 27 Wiring Connections Diagram VIII Electrical continued ...
Page 105: ...105 ...
Page 109: ...109 XIII Repair Parts continued APX625 APX725 and APX825 APX825 shown ...
Page 112: ...112 XIII Repair Parts continued APX425 and APX525 ...
Page 114: ...114 XIII Repair Parts continued APX625 APX725 and APX825 ...
Page 122: ...122 ...
Page 123: ...123 ...