21
IV. Venting
B. CPVC/PVC Venting (continued)
Table 7A: CPVC/PVC Vent & Air Intake Components Included With Boiler
Vent & Air Intake Components
Quantity
Models APX425 & APX525
Standard 4 In. Termination
Vent Kit (P/N 102189-03)
includes
Models APX625, APX725 & APX825
Standard 6 In. Termination Vent Kit
(P/N (103253-01)
includes
Schedule 40 PVC Tee
102190-02 (Qty. 2)
N/A
Schedule 40 PVC 90° Elbow
N/A
103313-01 (Qty. 2)
Stainless Steel Rodent Screen
102191-02 (Qty. 2)
102191-03 (Qty. 2)
30 in. Schedule 40 CPVC Pipe
102193-02
103267-01
Schedule 80 CPVC 90° Elbow
102192-02
103268-01
4 oz. Bottle of Transition Cement
102195-01
4 oz. Bottle of Primer
102194-01
CPVC/PVC Connector
4 in. x 4 in. 102183-03
6 in. x 6 in. 103270-01
CPVC/PVC Connector Gasket
4 in. x 4 in. 102185-02
6 in. x 6 in. 103248-01
NOTICE
Do not exceed maximum vent/combustion
air system length. Refer to “2. Vent/
Combustion Air Piping” under “A. General
Guidelines” of this section for maximum
vent/combustion air system length.
Use only vent and combustion air terminals
and terminal locations shown in “3. Vent/
Combustion Air Terminals” under “A.
General Guidelines” of this section.
1. Components
a. See Table 7A for CPVC/PVC vent and
combustion air components included with boiler.
b. See Table 7B for CPVC/PVC installer provided
vent and combustion air components required for
optional horizontal snorkel terminals shown in
Figure 6B.
c. See Table 7C for CPVC/PVC installer provided
vent and combustion air components required for
optional vertical roof terminals shown in Figure
7.
2. Field Installation of CPVC/PVC Two-Pipe
Vent System Connector
Refer to Figure 9 and following steps:
Vent Components
Quantity
APX425 & APX525
Horizontal (Snorkel)
Termination, 4 in.
APX625, APX725 & APX825
Horizontal (Snorkel)
Termination, 6 in.
Schedule 40 PVC Pipe x up to 7 ft. (2.1 m) max. vertical run
2
2
Schedule 40 PVC 90° Elbow
4
4
Schedule 40 PVC Pipe x 6 in. (150 mm) min. horizontal run
2
N/A
Schedule 40 PVC Pipe x 9 in. (230 mm)min. horizontal run
N/A
2
Table 7B: CPVC/PVC Vent & Air Intake Components (Installer Provided) required for Optional Horizontal
(Snorkel) Termination
a. Position the CPVC/PVC vent connector and
gasket onto boiler rear panel and insert vent
connector inner stainless steel vent pipe into heat
exchanger vent outlet.
b. Align vent connector plate and gasket clearance
holes with rear panel engagement holes. Then,
secure the connector and gasket to the panel with
six mounting screws.
c. Attach flue temperature sensor wiring harness
(taped to boiler rear panel) female connectors to
the sensor male spade terminals. Failure to do
so will prevent boiler from starting and boiler
display will flash Red and display Limit String
Fault (see Section XII “Troubleshooting” for
details).
NOTICE
Flue temperature sensor harness must be
connected to flue temperature sensor for the
boiler to start-up and operate properly. The
installation is not complete unless the harness
and the sensor are interconnected.
Summary of Contents for APEX
Page 57: ...57 VIII Electrical continued Figure 26 Ladder Diagram ...
Page 58: ...58 VIII Electrical continued ...
Page 59: ...59 Figure 27 Wiring Connections Diagram VIII Electrical continued ...
Page 105: ...105 ...
Page 109: ...109 XIII Repair Parts continued APX625 APX725 and APX825 APX825 shown ...
Page 112: ...112 XIII Repair Parts continued APX425 and APX525 ...
Page 114: ...114 XIII Repair Parts continued APX625 APX725 and APX825 ...
Page 122: ...122 ...
Page 123: ...123 ...