VI. Water Piping and Trim
E. Multiple Boiler Installation Water Piping (continued)
Figure 22B: Isolation of the Boiler From Oxygenated Water with A Plate Heat Exchanger
(IWH Piped Off System Header)
E. Multiple Boiler Installation Water Piping - See
Table 15 and Figures 22B 23A and 23B.
1. Refer to this Section of this manual for:
a. Installation of factory supplied piping and trim
components for an individual module (boiler).
b. Regarding an individual module (boiler) piping
system specific details.
c. Selection criteria for individual module (boiler)
space heating and/or DHW circulators.
2. For installations where indirect domestic hot
water heater is combined with space heating,
the Alliance SL™ model
must be piped as a separate
heating zone off the system header. The circulator must
be sized based on the Alliance SL™ model coil flow
and combined coil pressure drop and the zone piping
total equivalent length. Refer to Alliance SL™ Indirect
Water Heater literature for specific model coil flow and
pressure drop. Refer to Figures 23A and 23B.
Summary of Contents for APEX
Page 57: ...57 VIII Electrical continued Figure 26 Ladder Diagram ...
Page 58: ...58 VIII Electrical continued ...
Page 59: ...59 Figure 27 Wiring Connections Diagram VIII Electrical continued ...
Page 105: ...105 ...
Page 109: ...109 XIII Repair Parts continued APX625 APX725 and APX825 APX825 shown ...
Page 112: ...112 XIII Repair Parts continued APX425 and APX525 ...
Page 114: ...114 XIII Repair Parts continued APX625 APX725 and APX825 ...
Page 122: ...122 ...
Page 123: ...123 ...