INSTRUCTIONS FOR USE
AGS 400 - 1200 EN
Rev.12/2018
3
CENTRAL REGULATION SYSTEM ...................................................... 43
PRESSURE GAUGE .................................................................................. 44
THE PR3 ECFM PRESSURE REGULATOR ............................................ 45
THE EC (ARAG) DIRECTIONAL CONTROL VALVE ......................... 45
MAINTENANCE OF THE PRESSURE REGULATOR .......................... 45
CONTROL BEFORE USE .......................................................................... 46
PISTON MEMBRANE PUMPS BM 150/20 .............................................. 47
MEMBRANE CONTROL FOR PUMP 150/20, 105/20, 65/30 ................ 48
INSTRUCTIONS FOR DAMAGED MEMBRANE ................................. 48
WITH A MANUAL HOIST ........................................................................ 49
HYDRAULIC LIFTING MECHANISM .................................................... 49
SHOCK ABSORBERS ON THE SPRAY BOOM ..................................... 50
SPRAYING EQUIPMENT 12 HLX IN 15 HLX .................................... 52
CHARACTERISTICS OF SPRAYING EQUIPMENT 12HLX IN 15HLX52
COMPONENTS FOR CONTROLLING SPRAYING EQUIPMENT ....... 53
CONNECTION OF SPRAYING EQUIPMENT TO TRACTOR ............. 54
WIRING DIAGRAM 12 HLX in 15 HLX ................................................. 56
TRANSPORT SAFETIES ........................................................................... 57
MECHANICAL SHOULDER SUPPORTS FOR THE BOOM ARM ...... 57
SAFETY AGAINST OPENING AND CLOSING OF BOOMS ............... 58
CHARACTERISTICS OF SPRAYING EQUIPMENT 12 HLX IN 15 HLX59
HYDRAULIC BLOCKAGE AND DAMPENING ................................... 59
HYDRAULIC LEVELLING ...................................................................... 62
SHOULDER AND BOOM PIVOTS ......................................................... 65
BOOM OPENING MECHANISM ............................................................ 65
SETTING SPEED OF HYDRAULIC CYLINDERS ................................ 68