INSTRUCTIONS FOR USE
AGS 400-1200 EN
Rev.12/2018
65
Figure12.19
1
Spraying equipment
2
Driving direction
3
Safety joint
4
Obstacle
5
Safety boom
12.4.5
SHOULDER AND BOOM PIVOTS
Fastening of first boom on shoulder and fastening between booms (second and third boom) is pivoted
with slide bushings (1). All joint connection through pivoted slide bushings are connected with bolts
(2). At places of fastening, additional greasing points (3) for lubrication of pivots are given.
Figure 12.20
12.4.6
BOOM OPENING MECHANISM
The opening mechanism for the first arm is directly operated by the hydraulic cylinder (1 - Figure
12.21), attached to the shoulder and the first arm. The first part of the cylinder stroke opens the first
arm and the second part of the stroke opens the other arm. This is ensured by the tensioning rod (2),
which is connected to the mechanism of the second arm (3).