Unpacking and Packing
AGD155 Product Manual Rev.2.2
Page 13
3 Installation
3.1 Unpacking and Packing
Save the original box and packing materials in case you need to pack and return the product to the
manufacturer.
To unpack the product:
1.
Carefully remove the product from the box and the packing materials.
2.
Visually inspect the product to ensure that there is no damage. If any damage has occurred,
report it immediately to the carrier that delivered the package.
3.
After unpacking, locate the part number label on the product, and make sure it matches the
product your ordered, and that the voltage meets your specific requirements.
3.2 Mounting
3.2.1 Mounting the AGD155
The heatsink on the back of the AGD155 includes a hole (at top) and a slot (at bottom) for mounting
the unit. The AGD155 must be mounted vertically (book mounting), as shown in Figure 3.
The AGD155 is mounted using 2 M4 screws. It is important to mount the product on metal panel for
both grounding and secure connections.
The heatsink of the AGD155 is electrically conductive and serves as the protective earth (PE) ground
of the product. However, it is critical to ensure the PE screws are electrically conducting between the
PE of AGD155 and the PE of main power supply in the system.
All cables connected to the product must be securely constrained to avoid vibration that causes
stress concentration at the cables or connectors which may result in breakage of electrical
conductivity.
Warning – Metal Base Plate for Heat Dissipation
The product is supplied with the mounting plate built into the heatsink. At full power
operation, the heat sink can be quite warm, around 45°C. It is recommended to mount
the product on a large metal panel to help dissipate the heat generated in the product.