Aeroworks 30cc Laser 200 Assembly Manual
41
25. Finished fuel vent exit dot installation shown
below.
RADIO INSTALLATION
1. Gather the radio installation items as shown be-
low.
Required Parts
◊
1 - 8x80x300mm Foam Pad
◊
2 - Large Nylon Ties
◊
3 - 356x12.5mm Velcro Straps
Required Parts -Not Included
◊
1 - Receiver 6-8 Channel Recommended
◊
1 - Battery
(2600mah Li-Ion Shown )
◊
1 - Regulator
(Fromeco Sahara Shown )
◊
1 - Receiver Switch
(Smart-Fly Shown )
◊
1 - Adhesive backed Velcro
Required Tools and Adhesives
◊
Pencil/Felt Tip Pen
◊
Electric Drill
◊
1/16” Drill Bit
◊
Wire Cutter
◊
Masking Tape
2. If using the Smart-Fly Super Switch HD it may
be necessary to trim the switch mount. Locate
the switch back-plate and use this as a guide to
mark the needed opening for the switch.
3. Use a hobby knife to enlarge the switch opening
as shown below. Remember to test fit the switch
between cuts to ensure a perfect fit.