14
Aeroworks 30cc Laser 200 Assembly Manual
2. Assemble the ball links between the control
horns as shown. Secure with nylon lock nut.
ELEVATOR CONTROL HORN
INSTALLATION
1. Gather the elevator control horn parts as shown
below.
Required Parts
◊
2 - 4-40 ball link assemblies
◊
2 - Lock nuts
◊
2 - Left control horns
◊
2 - Right control horns
◊
12 - T2.6x12mm Wood screws
Required Tools and Adhesives
◊
1 - 5/64” Ball Driver
◊
1 - 3/32” Ball Driver
◊
1 - Pushrod Adjustment Wrench
◊
1 - Phillips Screw Driver
◊
1 - 1oz Bottle Gap Filling CA Glue
3. Align the control horns over the factory drilled
holes.
4. Use thick CA on each screw prior to installing to
lock screws in place.
Note:
CA glues have a fast drying time.
Remember to work quickly.
5. Align the left and right sides of the control horns
to the mounting holes and mount using six wood
screws as shown.
6. Repeat previous steps for remaining elevator
assembly.