![background image](http://html1.mh-extra.com/html/aerohive/access-point/access-point_deployment-manual_2862625066.webp)
Deployment Guide
65
M
OUNTING
THE
H
IVE
AP 340
Figure 14
Securing the HiveAP 340 to the hanger frame
7. Connect one or two Ethernet cables to the network, and—if not using PoE—connect the power cord to a power
source.
8. Replace the ceiling tile to complete the installation.
(bird’s eye view with the ceiling tiles
and ceiling tracks removed for clarity)
Insert the hanger clip upward
through the center slot in the
hanger frame.
Rotate the HiveAP 340 and the attached mounting accessories counterclockwise
until the clip locks in place against the sides of the crossbar.
HiveAP 340 attached to
the mounting plate
Hanger Frame
6
Summary of Contents for access point
Page 1: ...Aerohive Deployment Guide ...
Page 7: ...HiveAP Compliance Information 6 Aerohive ...
Page 13: ...Contents 12 Aerohive ...
Page 37: ...Chapter 2 The HiveAP 20 ag Platform 36 Aerohive ...
Page 71: ...Chapter 4 The HiveAP 340 Platform 70 Aerohive ...
Page 81: ...Chapter 5 The HiveAP 320 Platform 80 Aerohive ...
Page 105: ...Chapter 8 The High Capacity HiveManager Platform 104 Aerohive ...
Page 123: ...Chapter 10 Using HiveManager 122 Aerohive ...
Page 209: ...Chapter 14 Deployment Examples CLI 208 Aerohive ...