Chapter 4 The HiveAP 340 Platform
64
Aerohive
4. Remove the ceiling tile next to the area where you want to mount the device.
5. Press the hanger frame downward into place on the ceiling track until the claws on each leg grips the track
below the top ridge (see
Figure 13
).
Figure 13
Clipping the hanger frame onto the track
6. Insert the hanger clip upward through the center slot in the hanger frame, and then twist it counterclockwise
until the clip snaps into a locked position against the sides of the crossbar (see
Figure 14 on page 65
).
5
Remove the ceiling tile and enter the plenum.
4
Press the hanger frame onto the ceiling track.
Hanger Frame
Summary of Contents for access point
Page 1: ...Aerohive Deployment Guide ...
Page 7: ...HiveAP Compliance Information 6 Aerohive ...
Page 13: ...Contents 12 Aerohive ...
Page 37: ...Chapter 2 The HiveAP 20 ag Platform 36 Aerohive ...
Page 71: ...Chapter 4 The HiveAP 340 Platform 70 Aerohive ...
Page 81: ...Chapter 5 The HiveAP 320 Platform 80 Aerohive ...
Page 105: ...Chapter 8 The High Capacity HiveManager Platform 104 Aerohive ...
Page 123: ...Chapter 10 Using HiveManager 122 Aerohive ...
Page 209: ...Chapter 14 Deployment Examples CLI 208 Aerohive ...