© 2003, Adaptec, Inc.
151
139
Name
MLXEV_SYSDEV_REBUILD_DONE
Description Rebuild on logical drive is over.
Cause
Rebuild completed successfully only for this logical drive.
Action
None
Address
ctl: 0 logdrv: 15
Severity
4 (Information)
Source
InPro
140
Name
MLXEV_SYSDEV_REBUILD_CANCELED
Description Rebuild on logical drive has been cancelled.
Cause
User cancelled rebuild.
Higher priority rebuild started.
Action
Restart the rebuild if required.
Address
ctl: 0 logdrv: 15
Severity
2 (Error)
Source
InPro
141
Name
MLXEV_SYSDEV_REBUILD_ERROR
Description Rebuild stopped with error.
Cause
Due to an unknown error on the controller rebuild failed.
Action
Try rebuild again.
Address
ctl: 0 logdrv: 15
Severity
2 (Error)
Source
InPro
142
Name
MLXEV_SYSDEV_REBUILD_NEWDEV_FAILED
Description Rebuild stopped with error. New physical disk failed.
Cause
New physical disk failed.
New physical disk is not compatible with MDAC hardware/firmware.
Action
Replace the new disk.
Address
ctl: 0 logdrv: 15
Severity
2 (Error)
Source
InPro
143
Name
MLXEV_SYSDEV_REBUILD_SYSDEV_FAILED
Description Rebuild stopped because logical drive failed.
Cause
At least one more physical device failed in the array.
Action
It may not be possible to recover from this error.
Contact your service representative.
Address
ctl: 0 logdrv: 15
Severity
2 (Error)
Source
InPro
144
Name
MLXEV_SYSDEV_INIT_STARTED
Description Logical drive initialization started.
Cause
User started the initialization. Any previous data are lost.
Action
None
Address
ctl: 0 logdrv: 15
Severity
4 (Information)
Source
ExPro InPro
145
Name
MLXEV_SYSDEV_INIT_DONE
Description Logical drive initialization finished.
Cause
Initialize operation completed successfully.
Action
None
Address
ctl: 0 logdrv: 15
Severity
4 (Information)
Source
ExPro InPro
Table 2
RAID Controller Event Codes
Summary of Contents for MAN-00005-UG
Page 11: ...12 Spheras Storage Director Installation and User Guide ...
Page 28: ... 2003 Adaptec Inc 29 Figure 12 Installation Welcome ...
Page 34: ... 2003 Adaptec Inc 35 Figure 19 Client installation complete ...
Page 53: ...54 Spheras Storage Director Installation and User Guide ...
Page 65: ...66 Spheras Storage Director Installation and User Guide ...
Page 192: ... 2003 Adaptec Inc 193 Figure 105 Open Image File Dialog Box ...
Page 199: ...200 Spheras Storage Director Installation and User Guide ...