20
Installation & Commissioning Guide PKY470-700 Tri-Capacity Package with CM100 Control
Doc. No.0525-032
Ver. 9 180921
A
B
B
Remove First the
Access Panel - Electrical
Remove the
Access Panel - Compressor
Small
Compressor
Loosen Screws
(4-pcs / Comp.)
Shipping
Blocks
Large
Compressor
1. Remove Access Panel - Compressor
• Remove the Acess Panel - Compressor by following
the Access Panels removal procedure from previous
page.
2. Loosen the Screws - Compressor Mounting
•
Loosen the set screws that hold the compressors
down onto the unit (4 pcs. each).
Push back the
Compressor
Pull away the
Shipping Blocks
Shipping
Blocks
Shipping
Blocks
Tighten Screws
(4-pcs / Comp.)
Large
Compressor
Small
Compressor
3. Remove the Shipping Blocks
•
Push the Compressor back, taking care not to exert
too much force that may cause damage to the pipes.
•
Remove the Shipping Blocks by pulling them away.
• Repeat the same procedure for the 2nd compressor.
4. Tighten back the Screws
•
Firmly tighten the set screws to secure back the
compressors onto the unit.
• Check to make sure that there are no damage to the
piping systems.
UNIT PREPARATION
COMPRESSOR SHIPPING BLOCKS REMOVAL