END-TO-END CONFIGURATION (WITH OPTIONAL HOOD) ***
*
For Reverse Handing, Plug Fan service clearance and Optional Hood space clearance will be reversed.
**
Remove Optional Hood when service is required for the Plug Fan of the opposite unit.
***
Configuration shown above is a sample only of the many possibilities of unit banking configurations with
Optional Hood application. Provide a 300mm Space Clearance for the Optional Hood as shown.
SIDE-BY-SIDE CONFIGURATION
NOTES :
1. Service Clearance and Airflow Allowances given above are suggested minimum based on the condition that the spaces around
the units are free from any obstructions and a walkway passage of 1000mm between the units or between the unit and the
outside perimeter is available.
PLEASE NOTE THAT UNDER ALL CIRCUMSTANCES, CONDENSER AIR MUST NOT
RECIRCULATE BACK ONTO CONDENSER COIL.
2. Minimum service access areas and spaces for airflow are responsibilities of the installer,
ActronAir
®
will not be held responsible for any extra charges incurred due to lack of access and space for airflow.
3. Do not scale drawing.
UNIT 1
1000 mm
SERVICE
CLEARANCE
(PLUG FAN)
UNIT 2
1000 mm
SERVICE
CLEARANCE
(PLUG FAN)
UNIT 3
1000 mm
SERVICE
CLEARANCE
(PLUG FAN)
UNIT 1
1000 mm
SERVICE
CLEARANCE
(COMP. & ELEC.)
UNIT 2
1000 mm
SERVICE
CLEARANCE
(COMP. & ELEC.)
UNIT 3
1000 mm
SERVICE
CLEARANCE
(COMP. & ELEC.)
UNIT 2
1000 mm
FILTER
ACCESS
UNIT
3
1000 mm
FIL
TER
ACCESS
UNIT
1
1000 mm
FIL
TER
ACCESS
500mm
AIRFLOW
ALLOW
ANCE
500mm
AIRFLOW
ALLOW
ANCE
UNIT
2
&
UNIT
3
500 mm
AIRFLOW
ALLOW
ANCE
DUCT WORK
DUCT WORK
DUCT WORK
DUCT WORK
DUCT WORK
DUCT WORK
HEIGHT CLEARANCE FOR ALL THE UNITS = 1500mm
UNIT 2
OUTDOOR COIL
OUTDOOR COIL
INDOOR COIL
PLUG
FAN
UNIT 1
OUTDOOR COIL
OUTDOOR COIL
INDOOR COIL
PLUG
FAN
UNIT 3
OUTDOOR COIL
OUTDOOR COIL
INDOOR COIL
PLUG
FAN
AIRFLOW ALLOWANCE
500 mm
AIRFLOW ALLOWANCE
500 mm
AIRFLOW ALLOWANCE
500 mm
KEEP ALL CLEARANCES FREE
OF ANY OBSTRUCTIONS
HEIGHT CLEARANCE FOR ALL THE UNITS = 1500mm
DUCT
WORK
DUCT
WORK
UNIT 1
1000 mm
FILTER
ACCESS
500 mm
AIRFLOW
ALLOW
ANCE
DUCT
WORK
DUCT
WORK
UNIT 2
1000mm
SERVICE
CLEARANCE
(COMP. & ELEC.)
+
(PLUG FAN
*
)
UNIT 2
1000 mm
FILTER
ACCESS
UNIT 1
OUTDOOR COIL
OUTDOOR COIL
INDOOR COIL
PLUG
FAN
UNIT 2
OUTDOOR COIL
OUTDOOR COIL
INDOOR COIL
PLUG
FAN
UNIT 1
1000mm
SERVICE
CLEARANCE
(PLUG FAN
*
COMP. & ELEC.)
+
UNIT 2
AIRFLOW
ALLOWANCE
1100 mm
SERVICE CLEARANCE
=
+
UNIT 2
SPACE CLEARANCE
UNIT 2
OPTIONAL HOOD
**
AIRFLOW ALLOWANCE
500 mm
AIRFLOW ALLOWANCE
500 mm
OPTIONAL
HOOD
300 mm
*
SP
ACE CLEARANCE
800 mm
556 mm
OUTSIDE AIR
ACCESS
OPTIONAL
HOOD
300 mm
*
SP
ACE CLEARANCE
800 mm
556 mm
OUTSIDE AIR
ACCESS
KEEP ALL CLEARANCES FREE
OF ANY OBSTRUCTIONS
BANKING OF UNITS