vii
Equipment rack precautions
Follow the rack manufacturer's safety and installation instructions for proper
rack installation.
The following additional rack safety installation measures shall be considered:
•
Anchor the equipment rack
The equipment rack must be anchored to an unmovable suitable support
to prevent the rack from falling over when one or more systems are fully
extended out of the rack assembly. You must also consider the weight of
any other devices installed in the rack assembly. The equipment rack must
be installed according to the manufacturer's instructions.
•
Main AC power disconnect
You are responsible for installing an AC power disconnect for the entire
rack unit. This main disconnect must be readily accessible, and it must be
labeled as controlling power to the entire unit, not just to the system(s).
•
Grounding the rack installation
To avoid the potential for an electrical shock hazard, the rack assembly
itself must be suitably earth grounded, according to your local regional
electrical codes. This typically will require the rack to have its own separate
earth ground. We recommend you consult your local approved electrician.
AA G900 ug - EN.book Page vii Wednesday, September 25, 2002 5:23 PM
Summary of Contents for Altos G900
Page 1: ...Acer Altos G900 User s guide ...
Page 10: ...x ...
Page 16: ...xvi ...
Page 17: ...1 System tour ...
Page 43: ...2 System setup ...
Page 44: ...This chapter describes the system setup procedures both for hardware and software aspects ...
Page 55: ...3 Hardware configuration ...
Page 56: ...This chapter describes detailed procedures for system hardware setup ...
Page 127: ...4 BIOS setup ...
Page 160: ...4 BIOS setup 144 ...
Page 161: ...Appendix A System rack installation ...
Page 162: ...This appendix describes the procedures for configuring the system in a rack mount fashion ...
Page 175: ...159 5 Slide the server into the rack Figure 70 Mounting the server to the rack ...
Page 176: ...Appendix A System rack installation 160 ...
Page 177: ...Appendix B System management ...
Page 210: ...Appendix B System management 194 ...
Page 211: ...Appendix C Equipment log and configuration worksheets ...
Page 217: ...201 ...
Page 218: ...Appendix C Equipment log and configuration worksheets 202 ...
Page 219: ...Appendix D Troubleshooting ...