3 Hardware configuration
42
Preinstallation instructions
Always observe the following before you install any component:
1
Turn off your system and all the peripherals connected to it.
2
Unplug all cables from the power outlets.
3
Open your system according to the instructions on page 44.
4
Follow the ESD precautions described in this chapter when
handling a server component.
5
Remove any expansion board(s) or peripheral(s) that block access
to the DIMM socket or other component connector.
Warning! Failure to properly turn off the server before you
start installing components may cause serious damage.
Do not attempt the procedures described in the following
sections unless you are a qualified service technician.
Post-installation instructions
Observe the following after installing a server component:
1
See to it that all components are installed according to the
described step-by-step instructions.
2
Check to make sure you have not left loose tools or parts inside the
system.
3
Reinstall any expansion board(s), peripheral(s), board cover(s) that
you have previously removed.
4
Reinstall the chassis panels
5
Insert and lock the padlock to the system to prevent unauthorized
access to the inside of the system.
6
Connect all external cables and the AC power cord(s) to the
system.
7
Turn on the system.
AA G900 ug - EN.book Page 42 Wednesday, September 25, 2002 5:23 PM
Summary of Contents for Altos G900
Page 1: ...Acer Altos G900 User s guide ...
Page 10: ...x ...
Page 16: ...xvi ...
Page 17: ...1 System tour ...
Page 43: ...2 System setup ...
Page 44: ...This chapter describes the system setup procedures both for hardware and software aspects ...
Page 55: ...3 Hardware configuration ...
Page 56: ...This chapter describes detailed procedures for system hardware setup ...
Page 127: ...4 BIOS setup ...
Page 160: ...4 BIOS setup 144 ...
Page 161: ...Appendix A System rack installation ...
Page 162: ...This appendix describes the procedures for configuring the system in a rack mount fashion ...
Page 175: ...159 5 Slide the server into the rack Figure 70 Mounting the server to the rack ...
Page 176: ...Appendix A System rack installation 160 ...
Page 177: ...Appendix B System management ...
Page 210: ...Appendix B System management 194 ...
Page 211: ...Appendix C Equipment log and configuration worksheets ...
Page 217: ...201 ...
Page 218: ...Appendix C Equipment log and configuration worksheets 202 ...
Page 219: ...Appendix D Troubleshooting ...