![background image](http://html.mh-extra.com/html/acer/altos-g900/altos-g900_user-manual_5830050.webp)
2 System setup
34
8
Installing an additional power supply or additional peripherals -
see page 86, page 98, and any additional documentation that
came with the peripherals.
9
Reinstalling the system access panels:
a
Installing the access cover to the system boards - see page 52
b
Installing the rear access panel - see page 45
You have completed the hardware setup. The remainder of this
section discusses software setup and configuration. Refer to page 36.
Turning on the server and running the Power-On
Self Test (POST)
Each time you start the server, the Power-On Self Test (POST) runs
automatically. POST is stored in flash memory.
To start the server, do the following:
Note:
To access certain features, such as BIOS setup, you must
press specific keys at specific times during POST. To familiarize
yourself with this procedure, read the following instructions
completely before actually performing them. For a summary of
hot keys active during POST, see page 35.
1
Make sure all external devices, such as a monitor, keyboard, and
mouse, are connected.
2
If a drive protection card or diskette is present in the diskette
drive, remove it.
3
Plug the video monitor power cord into the power source or wall
outlet. Turn on the video monitor.
4
Plug the AC power cords into the power connectors on the back of
the chassis and into the power source or wall outlet.
5
If the server does not turn on when you plug it into the AC outlet,
press the on/off power button on the front panel.
6
Verify that the main power LED on the front panel is lit.
After a few seconds, POST begins and a splash screen is displayed
(if the splash screen is disabled in BIOS setup, a diagnostics screen
is displayed). POST discovers, configures, and tests the processors,
memory, keyboard, and most installed peripheral devices. The
AA G900 ug - EN.book Page 34 Wednesday, September 25, 2002 5:23 PM
Summary of Contents for Altos G900
Page 1: ...Acer Altos G900 User s guide ...
Page 10: ...x ...
Page 16: ...xvi ...
Page 17: ...1 System tour ...
Page 43: ...2 System setup ...
Page 44: ...This chapter describes the system setup procedures both for hardware and software aspects ...
Page 55: ...3 Hardware configuration ...
Page 56: ...This chapter describes detailed procedures for system hardware setup ...
Page 127: ...4 BIOS setup ...
Page 160: ...4 BIOS setup 144 ...
Page 161: ...Appendix A System rack installation ...
Page 162: ...This appendix describes the procedures for configuring the system in a rack mount fashion ...
Page 175: ...159 5 Slide the server into the rack Figure 70 Mounting the server to the rack ...
Page 176: ...Appendix A System rack installation 160 ...
Page 177: ...Appendix B System management ...
Page 210: ...Appendix B System management 194 ...
Page 211: ...Appendix C Equipment log and configuration worksheets ...
Page 217: ...201 ...
Page 218: ...Appendix C Equipment log and configuration worksheets 202 ...
Page 219: ...Appendix D Troubleshooting ...