3 Hardware configuration
104
7
8
Remove the two plastic rivets and the plastic overlay from the
power distribution board.
9
Attach the plastic overlay to the new power distribution board
using the two plastic rivets.
10 Grasp the new power distribution board and overlay with the
power supply connectors facing the power supply bays.
11 Tilt the edge of the power distribution board in your hand about
30° and gently slide the other edge of the board into the four slots
in the power supply bays.
12 When the board is inserted all the way into the slots, tilt the board
down so the four mounting holes on the edge of the board are
aligned with the corresponding holes in the main chassis.
13 Tighten the four screws to secure the power distribution board to
the main chassis.
14 Install the power supplies.
15 Install the electronics bay (refer to page 49).
16 Connect the cables to the power distribution board and
mainboard.
17 Close the front subchassis and electronics bay.
18 Install the front and rear access covers (refer to page 46 and
page 45).
Label
Description
Label
Description
A
Power supply module
B
Screws
AA G900 ug - EN.book Page 104 Wednesday, September 25, 2002 5:23 PM
Summary of Contents for Altos G900
Page 1: ...Acer Altos G900 User s guide ...
Page 10: ...x ...
Page 16: ...xvi ...
Page 17: ...1 System tour ...
Page 43: ...2 System setup ...
Page 44: ...This chapter describes the system setup procedures both for hardware and software aspects ...
Page 55: ...3 Hardware configuration ...
Page 56: ...This chapter describes detailed procedures for system hardware setup ...
Page 127: ...4 BIOS setup ...
Page 160: ...4 BIOS setup 144 ...
Page 161: ...Appendix A System rack installation ...
Page 162: ...This appendix describes the procedures for configuring the system in a rack mount fashion ...
Page 175: ...159 5 Slide the server into the rack Figure 70 Mounting the server to the rack ...
Page 176: ...Appendix A System rack installation 160 ...
Page 177: ...Appendix B System management ...
Page 210: ...Appendix B System management 194 ...
Page 211: ...Appendix C Equipment log and configuration worksheets ...
Page 217: ...201 ...
Page 218: ...Appendix C Equipment log and configuration worksheets 202 ...
Page 219: ...Appendix D Troubleshooting ...