Appendix A: System rack installation
156
3
Attach the three bushings on the left frame wall of the chassis
(Figure 65, E) in the pattern shown in Figure 65 using the same
procedure described in step 1.
Installing the handles and rails
To complete the installation the rack conversion kit contents, you must
also have the rack-mount rail kit.
WARNING! To avoid personal injury when handling the
server, use a hand-truck or other mechanical assist unit to
move the server from one location to another. Do not
attempt to lift or move the server by the handles on the
power supplies.
Refer to the installation guide that came with the rack-mount rail kit
for detailed instructions on installing the handles and rails, as well as
mounting the server in the rack.
Figure 65 - Installing the bushings
AA G900 ug - EN.book Page 156 Wednesday, September 25, 2002 5:23 PM
Summary of Contents for Altos G900
Page 1: ...Acer Altos G900 User s guide ...
Page 10: ...x ...
Page 16: ...xvi ...
Page 17: ...1 System tour ...
Page 43: ...2 System setup ...
Page 44: ...This chapter describes the system setup procedures both for hardware and software aspects ...
Page 55: ...3 Hardware configuration ...
Page 56: ...This chapter describes detailed procedures for system hardware setup ...
Page 127: ...4 BIOS setup ...
Page 160: ...4 BIOS setup 144 ...
Page 161: ...Appendix A System rack installation ...
Page 162: ...This appendix describes the procedures for configuring the system in a rack mount fashion ...
Page 175: ...159 5 Slide the server into the rack Figure 70 Mounting the server to the rack ...
Page 176: ...Appendix A System rack installation 160 ...
Page 177: ...Appendix B System management ...
Page 210: ...Appendix B System management 194 ...
Page 211: ...Appendix C Equipment log and configuration worksheets ...
Page 217: ...201 ...
Page 218: ...Appendix C Equipment log and configuration worksheets 202 ...
Page 219: ...Appendix D Troubleshooting ...