background image

14

Note:

POSITIONING OF TERMINALS FOR "FORCED DRAFT" APPLIANCES (extracted from the UNI 7129 standard)

Under window 

A  

600

Under ventilation opening 

600

Under gutter 

300

Below balcony 

(1) 

300

From an adjacent window 

400

From an adjacent ventilation opening 

600

From vertical or horizontal pipes or drains 

 (2) 

300

From the corner of the building

 

300

From a recess of the building 

300

From the ground or from another walking surface 

L  

2200

Between two vertical terminals 

1500

Between two terminals in horizontal 

1000

From a front surface facing without openings or terminals within a radius of 3 meters from the outlet of the fumes 

 

2000

The same, but with openings or terminals within a radius of 3 meters from the outlet 

P  

3000

Posi

tion of the unit

Distan

ce

min 

in mm

Units heating power 

16

 - 

35 kW

Type C53

 

Boiler with combustion air intake ducts and

 

evacuation of 

separate combustion products.

 

These ducts can discharge in 

different pressure areas.

 

The positioning of the two terminals on 

walls is not permitted

 

opposing.

 

The boiler must be equipped with 

a fan upstream of the

 

combustion chamber / heat exchanger.

Type C63

Boiler with combustion air intake ducts and

 

evacuation of the 

feasible combustion products

 

using separately marketed and 

certified tubes.

 

The realized system must not have a loss of load, 

with

 

boiler with nominal power, higher than the residual head

 

of 

the fan.

Type C83

Boiler designed to be connected to a terminal for the

 

withdrawal 

of combustion air and an individual chimney or

 

collective for the 

discharge of fumes.

 

The flue must comply with current 

regulations.

 

The boiler must be equipped with a fan upstream of 

the

 

combustion chamber / heat exchanger.

DIAMETER COAXIALS 100/60 MM

Type C13

These values refer to air intake / exhaust ducts

fumes made using rigid and smooth pipes

originals, supplied by the manufacturer.

The maximum allowed length of horizontal coaxial pipes

100/60 mm is 7 meters including the first corner.

For each rectilinear pipe added with a length of 1 meter the maximum 

allowed length must be decreased by 1 meter.

(1) The terminals under a workable balcony must be placed

in such a position that the total path of the fumes, from the exit point

of the same from the terminal to their outlet from the external

perimeter

of the balcony, including the height of the eventual balustrade of

protection, not less than 2000 mm.

(2) In the placement of the terminals must be adopted

distances not less than 500 mm from action sensitive materials

of combustion products (for example, gutters and downspouts in

plastic material, lumber in wood, etc.) unless adopted

adequate shielding measures with respect to these materials.

4.6 CONFIGURATION OF AIR SUCTION DUCTS /

FUME EXHAUST TYPE B23

Boiler designed to be connected to a flue or a device for discharging

the products of combustion outside of the room in which it is installed.

The air is drawn in the installation room and unloaded of the

combustion products takes place outside the room same.

The boiler must not be equipped with a draft diverter

windproof, while it must be equipped with a fan upstream of the

combustion chamber / heat exchanger.

Type C13

Boiler designed to be connected to horizontal terminals of

exhaust and intake directed to the outside through type ducts

coaxial or by means of split type ducts.

The distance between the air inlet duct and the outlet duct

fumes must be at least 250 mm and both terminals

they must still be placed inside a square

of 500 mm on the side.

The boiler must be equipped with a fan upstream of the

combustion chamber / heat exchanger.

Type C33

Boiler designed to be connected to vertical terminals of

exhaust and intake directed to the outside through type ducts

coaxial or by means of split type ducts.

The distance between the air inlet duct and the outlet duct fumes 

must be at least 250 mm and both terminals they must still be placed 

inside a square of 500 mm on the side.

The boiler must be equipped with a fan upstream of the combustion 

chamber / heat exchanger.

Type C43

Boiler designed to be connected to a system of collective chimneys 

including two ducts, one for the suction of the combustion air and the 

other for the evacuation of the combustion products, coaxial or 

through ducts split.

The flue must comply with current regulations.

The boiler must be equipped with a fan upstream of the combustion 

chamber / heat exchanger

Summary of Contents for HUB RADIATOR PACK CF 3.0

Page 1: ...ATION HUB RADIATOR PACK CF Factory made high efficiency integrated hybrid system patented heat pump with direct exchange refrigerant water to produce DHW heating and air conditioning HUB RADIATOR PACK...

Page 2: ...2...

Page 3: ...3 5 1 4 5 1 5 5 1 6 5 1 7 5 2 6 2 1 6 2 2 6 2 3 6 3 7 3 1 7 3 2 8 3 3 8 3 4 8 3 5 8 3 6 Pump Down 8 3 7 9 4 INSTALLATION OF INDOOR UNITS 10 4 1 Choosing the place of installation 10 4 2 Technical data...

Page 4: ...tructions 27 9 5 General system checks 27 10 START UP 27 10 1 First start up checks 27 10 2 Starting up 27 11 REPAIR COMPONENTS REPLACEMENTS 27 11 1 Refrigerant circuit 27 11 2 Drying and vacuum of th...

Page 5: ...be installed at wall or recessed the indoor unit is supplied complete with all the appropriate ones internal copper exchangers R410A refrigerant gas connections DHW connections air vent valve safety v...

Page 6: ...2 x 0 75 mm 2 x 2 20 A curv D Table 2 Tightening torque Torque Tightening min max N m 1 4 14 18 3 8 33 42 5 8 63 77 Table 3 Refrigerant charge m Max Add refrigerant quantity g m HR 3 0 5 15 5 20 HR 7...

Page 7: ...not compromise the product operation and or personal safety e of assets Make sure that the space at the back of the unit is greater than 30 cm The front must have more than 60 cm of space Ensure that...

Page 8: ...at each tube both the gas side tubes and the liquid between internal group and external group has been connected in the correct way and that all the wiring necessary for the testing have been carried...

Page 9: ...pressure gauge using the refrigerant gas Completely close the liquid valve Turn on the machine in cooling mode When the pressure of the pressure gauge goes from 0 to 0 5 kg 2G cm between 14 2 and 7 1...

Page 10: ...as connection 19 Gas connection R410A 5 8 4 1 CHOICE OF INSTALLATION SITE OF THE HYBRID SYSTEM When determining where to install the internal unit of the system hybrid HUB RADIATOR PACK CF take the fo...

Page 11: ...that the support surface is regular Use the bracket as a template and mark the position of the holes from to achieve x 3 Wilo Yonos Pico 25 18 60 4 5 7 5 4 75 4 6 3 4 3 4 1 2 1 2 230V 1 50Hz 1447 720...

Page 12: ...pipes the weight of which must not burden on the appliance properly insulate the pipes to find the right ones heat losses H Connect a special safety drain in correspondence of the 1 2 female threaded...

Page 13: ...or exclude them safety devices In the event of repeated shutdowns of the boiler it is necessary have the air intake flue gas exhaust ducts checked which may be blocked or inadequate for the disposal o...

Page 14: ...tion that the total path of the fumes from the exit point of the same from the terminal to their outlet from the external perimeter of the balcony including the height of the eventual balustrade of pr...

Page 15: ...temperatura di spegnimento dopo accensione bruciatore 0 20 0 DO NOT MODIFY THIS VALUE P61 Selezione allarme temperatura scarico fumi 20 150 105 P62 Not used P63 Not used P64 Not used P65 Anti legionel...

Page 16: ...0 1 1 DO NOT MODIFY P20 Selection of the minimum value of the DHW 35 50 35 P21 Low temperature zone selection 0 1 0 0 High temperature 1 Low temperature P22 Not used P23 Selection of pump activation t...

Page 17: ...bustion regulation CO2 4 7 3 CHECK AND ADJUSTMENT OF THE GAS VALVE PREMISE The boiler by means of the BEST function is suitable automatically combustion according to the conditions of installation the...

Page 18: ...s specified below Control operations general check of the integrity of the boiler check the tightness of the gas circuit of the boiler and the gas supply network to the boiler control of the boiler su...

Page 19: ...s network and the electricity grid The materials of which the boiler is made are all recyclable Once dismantled the boiler must be disposed of in compliance of the legislation in force in the country...

Page 20: ...o use the boiler only it is necessary to set IC to ON and set DC to EMERGENCY Simultaneously put the CD control in STAND BY by pressing the SUN button Booster terminal board Technical water probe Boos...

Page 21: ...the integration boiler it is necessary to set IC to ON and set DC to INTEGRATION In this way the control unit will decide when the help of the boiler is needed which will work in support of the heat...

Page 22: ...12 3 03 2 91 10 3 45 3 37 3 29 3 20 3 10 2 98 11 3 55 3 46 3 37 3 28 3 18 3 06 12 3 64 3 55 3 45 3 36 3 25 3 13 13 3 75 3 64 3 54 3 44 3 33 3 20 14 3 85 3 74 3 63 3 52 3 41 3 28 15 3 95 3 83 3 72 3 6...

Page 23: ...ting C 30 35 40 45 50 55 1 074 10 2 96 2 59 2 25 1 91 1 59 1 27 HR 3 0 9 3 04 2 67 2 32 1 98 1 65 1 33 8 3 14 2 75 2 39 2 05 1 71 1 39 7 3 23 2 84 2 47 2 12 1 78 1 46 6 3 32 2 92 2 54 2 19 1 84 1 52 5...

Page 24: ...cold water filter 19 Secondary plate heat exchanger 20 Domestic hot water temperature sensor 21 Automatic by pass integrated on plate heat exchanger 22 Motorized 3 way valve S Condensate drain G Gas i...

Page 25: ...an speed x100 TMax operating temperature in heating mode Total expansion vessel capacity 6 5 TECHNICAL FEATURES BOILER HUB RADIATOR PACK CF TECHNICAL FEATURES kW bar bar bar bar l min V Hz A W IP Kg m...

Page 26: ...d mode with the active boiler for DHW production and external booster in active heat pump to produce chilled water up to 4 C per power the hydronic terminals IC ON OFF O I CD 2 0 0 1 2 3 4 5 H m 4 6 8...

Page 27: ...UP Before proceeding with the commissioning of the appliance you need to make sure that the safety conditions and all the provisions listed in this manual has been complied with the fixing to the sup...

Page 28: ...inants that have been must be eliminated introduced to clean the circuit or to effect the operations carried out WARNING Do not inhale the refrigerant vapors coming from burned compressors as it can b...

Page 29: ...as to obtain a temperature of system delivery that increases in a way proportional to decreasing air temperature external To proceed with this function set the value of the parameter ST08 and ST03 at...

Page 30: ...ler Boiler differential boiler Boiler activation delay time boiler SET POINT external air compressor deactivation Compressor activation external air differential PARAMETERS OF ALARMS FUNCTIONS Probe f...

Page 31: ...bled but not active the icon is off ___________________________________________________ On during access to the functions menui ___________________________________________________ Lit if the resistanc...

Page 32: ...ws exit from parameter programming 2 contemporary pressure prolonged keys allows entry into manual defrost ___________________________________________________ Remote terminal Regarding the use of the...

Page 33: ...ure falls below 90 C P1 probe alarm PB1 probe alarm PB2 probe alarm PB3 faulty probe or resistive value out of range faulty probe or resistive value out of range probe alarm PB4 faulty probe or resist...

Page 34: ...al probe 3 Substitution of tract 1 Replacement of the outdoor unit probe 2 Connection cable replacement external probe 3 Substitution of tract 1 Thermostat replacement 2 External booster recharge 3 co...

Page 35: ...int ST21 Set massimo ambiente in chiller ST18 110 230 C F Dec int ST22 Set point ambiente in p d c ST24 ST25 C F dec int ST23 Differenziale ambiente in p d c 0 0 0 25 0 45 C F Dec int ST24 Set minimo...

Page 36: ...pen contact 0 1 CF16 Polarity ID5 0 Active close contact 1 Active open contact 0 1 ventilatore di mandata 13 Allarme termica pompa acqua condensatore 14 Flussostato condensatore CF09 CONFIGURATION ID2...

Page 37: ...sent 1 Continuous operation in ON OFF output 2 Operation on compressor request 3 Continuous output operation 4 20mA 4 Operation on request of the compressor 4 20mA 0 4 CO12 Compressor 0 Enabled 1 OFF...

Page 38: ...6 Minimum defrost alarm 0 Not enabled 1 Enabled 0 1 dF17 Minimum alarm delay when reversing the 4 way valve 0 250 Sec FA09 Maximum fan speed in summer 30 100 FA10 Minimum fan speed temperature pressur...

Page 39: ...utput relay polarity 0 Output without voltage in normal conditions with voltage in the presence of an alarm 1 Output with voltage in normal conditions without voltage in the presence of an alarm 0 1 A...

Page 40: ...CE dei prodotti comporta il controllo costante of production with the aim of guaranteeing the conformity of the appliances with the safety and performance characteristics of the verified samples The...

Page 41: ..._________ Raffrescamento estivo Produzione ACS Riscaldamento Distanza tra unit interna ed esterna max 15 m Dislivello tra unit interna ed esterna max 5 m Le tubazioni delle linee frigorifere 1 4 3 8 p...

Page 42: ..._________________________________________________________ Attenzione la mancata effettuazione del primo avviamento per cause non dipendenti dall unit comporter una seconda visita la quale sar a voi di...

Page 43: ..._____________ ___________ ________________ BOOSTER POSIZIONATO A TERRA A MURO A FINESTRA SU STAFFE ANTIVIBRANTI MENSOLE A TETTO ALTRO SU BASI A SOSPENSIONE A RINGHIERA INSTALLAZIONE CON PONTEGGIO SI N...

Page 44: ...AICO SPENTO FUNZIONAMENTO IN POMPA DI CALORE BOOSTER 1 TEMPERATURA DI EVAPORAZIONE U E C Pb3 _______ TEMPERATURA ACQUA TECNICA C Pb1 _______ NB TEMPERTATURA DI INIZIO CONDENSAZIONE C _______ Attendere...

Page 45: ...ence must be made to the natural or legal person who has purchased the Product regardless of whether the seller is A2B ACCORRONI E G or other person marketing branded products A2B ACCORRONI E G This w...

Page 46: ...rroni mediante ogni opportuna operazione di trattamento manuale ed informatico per finalit funzionali all adempimento degli obblighi derivanti dal contratto di fornitura di beni servizi da parte di Ac...

Page 47: ...provisions of the law on the subject of deduction for the energy requalification costs of the existing building heritage the A2B Accorroni E G Ltd DECLARES that the product complies with the European...

Page 48: ...corroni E G s r l Via d Ancona 37 60027 Osimo An Tel 071 723991 web site www accorroni it e mail a2b accorroni it A2B Accorroni E G S r l reserve the right to make changes without prior notice TECHNIC...