PQFA Instructions Manual
Asea Brown Boveri Jumet S.A.
40
Figure 6.6. Connection between CT1, CT2 , the summation CT and PQF
for one phase.
6
6
.
.
4
4
.
.
2
2
.
.
4
4
.
.
C
C
a
a
s
s
e
e
4
4
:
:
t
t
w
w
o
o
i
i
n
n
d
d
e
e
p
p
e
e
n
n
d
d
e
e
n
n
t
t
f
f
e
e
e
e
d
d
i
i
n
n
g
g
t
t
r
r
a
a
n
n
s
s
f
f
o
o
r
r
m
m
e
e
r
r
s
s
.
.
Two independent transformers (the tie is normally open) feeds two different
set of loads. One active filter is fitted on each LV busbar.
This system may however also work in degraded mode: the tie is closed and
only one transformer feeds the whole LV system.
By connecting the CT’s as described hereafter, it is still possible to filter
properly the harmonics and to correct the power factor.
Figure 6.7. Two independent transformers: single-line diagram
PQF
PQF
T1
T2
S1, k
S2, l
S1, k
S2, l
P1
P2
P1
P2
S1
S2
k
l
PQF
Side A
Side B
P1, K
P2, L
P1, K
P2, L
Summary of Contents for PQFA
Page 1: ...Instructions Manual PQFA Power Quality Filter ABB Jumet ...
Page 19: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 19 Master cubicle view Zoom on next page ...
Page 20: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 20 ...
Page 21: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 21 Control rack details ...
Page 22: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 22 Master cubicle door view ...
Page 24: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 24 ...
Page 25: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 25 Slave cubicle door view ...
Page 28: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 28 ...