PQFA Instructions Manual
Asea Brown Boveri Jumet S.A.
44
7. Cubicles interconnections
7.1.
Introduction
This section explains how to connect PQF cubicles (Master-Slave or Slave-
Slave) when they do not come connected from the factory or case or on-site
extension.
The section starts with mechanical installation.
Electrical connections are then described: interconnections between cubicles
and with the supply
All cables needed to make the connections are supplied with the units.
7.2.
Mechanical installation
The side panels of the cubicles to be interconnected have first to be removed
(except the outside one of the Master and last Slave cubicles).
The provided divider panel seal has to be fixed on the interior frame between
cubicles.
Cubicles are then interconnected at 6 fixation points as indicated in Figure
3.1.
The baying kit is provided with the cubicles (not the tools).
Figure 7.1. Mechanical installation
Summary of Contents for PQFA
Page 1: ...Instructions Manual PQFA Power Quality Filter ABB Jumet ...
Page 19: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 19 Master cubicle view Zoom on next page ...
Page 20: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 20 ...
Page 21: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 21 Control rack details ...
Page 22: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 22 Master cubicle door view ...
Page 24: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 24 ...
Page 25: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 25 Slave cubicle door view ...
Page 28: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 28 ...